Boardman Main Canal Outage
April 5, 2023 - The concrete truck finally arrived Monday (4/3/23) afternoon (delayed because of the snow!). Water was turned into Boardman again this morning, after letting the concrete cure. The Boardman canal is filling, and water will be available anytime.
March 31, 2023 -- A landowner called this morning notifying us of a washout near the beginning of the Boardman Canal. WEID crews are draining the Boardman canal by diverting water at the siphon. We are moving equipment in to do the groundwork, which will start as soon as the area is drained. The concrete truck is scheduled for Monday morning. Keep watching for updates.